South Street Culvert Repair

PROGRESS

The W. South Street culvert repair is currently under engineer design.

 

15%

February 22, 2018 Due to ongoing erosion and further damage to the culvert, W. South Street between Green Street and Brookside Drive is CLOSED to all traffic until further notice. The street will remain closed while the structural stability of our infrastructure can be reevaluated.

March 22, 2018 - Construction and repair of the new culvert are expected to begin Mid-April. Foot traffic on W. South Street will be closed during construction.

 

PROJECT SUMMARY & LOCATION

On March 8, 2017 the structural integrity of the Sandstone Creek culvert on W. South St. was inspected and evaluated. The new culvert design is currently being engineered. Culvert repair is anticipated late Summer 2018.